Abstract
Construction planning and scheduling is an important tool in a construction project. In every construction project a lot of activities are involved which need to be planned and scheduled properly to ensure the successful completion of the project. Therefore the study on construction planning and scheduling is important so as to provide a view on how it is to be implemented on construction project. This paper consists of study on the concept of planning and scheduling of various activities associated with building construction project. Also study of project management software (MSP) is done. To find out total project duration and critical path planning and scheduling technique is to be used. From the results of planning and scheduling delays that occur in the project are analyzed. In the next step controlling technique is for optimization of the completion time of the project.
##plugins.themes.academic_pro.article.details##
How to Cite
Vansh Chauhan, N. K. R. R. (2015). Planning, Scheduling and Delay Analysis of Construction Project. International Journal of Emerging Trends in Science and Technology, 2(06). Retrieved from http://igmpublication.org/ijetst.in/index.php/ijetst/article/view/722
References
1. H. A. Bassioni and A. M. mubarak "Causes of delay in building construction projects" (ASCE) (2008) Journal of Construction Engineering and Management, Vol. 134, No. 11, November 1, 2008. ©ASCE, ISSN 0733-9364/2008/11-831–841/$25.00.
2. Mohd Khalil Bin Abdul Kadir (2006) "Construction planning and scheduling a case study"
3. Mohd Razali A. kadir, Azizah salim "The significant factors causing delay of building construction projects in Malaysia Engineering, Construction and Architectural Management Vol. 14 No. 2, 2007 pp. 192-206 @ Emerald Group Publishing Limited 0969-9988 DOI 10.1108/09699980710731308
4. MS PROJECT tutorial by Yash Majeethia.
5. Nuhu Brahimah "Construction delay analysis techniques " at Buildings 2013, 3, 506-531. doi:10.3390/buildings3030506 Published: 23 July 2013.
6. T. Subramani et al Planning and Scheduling of High Rise Building Using Primavera Int. Journal of Engineering Research and Applications ISSN: 2248-9622, Vol. 4, Issue 6(Version 5), June 2014, pp.134-144.
2. Mohd Khalil Bin Abdul Kadir (2006) "Construction planning and scheduling a case study"
3. Mohd Razali A. kadir, Azizah salim "The significant factors causing delay of building construction projects in Malaysia Engineering, Construction and Architectural Management Vol. 14 No. 2, 2007 pp. 192-206 @ Emerald Group Publishing Limited 0969-9988 DOI 10.1108/09699980710731308
4. MS PROJECT tutorial by Yash Majeethia.
5. Nuhu Brahimah "Construction delay analysis techniques " at Buildings 2013, 3, 506-531. doi:10.3390/buildings3030506 Published: 23 July 2013.
6. T. Subramani et al Planning and Scheduling of High Rise Building Using Primavera Int. Journal of Engineering Research and Applications ISSN: 2248-9622, Vol. 4, Issue 6(Version 5), June 2014, pp.134-144.